Yongxiang 2nd phase project comes into production
2011-09-30
September, 29, the 2nd phase project of 3,000 tons/year by Sichuan Yongxiang Polysilicon Co., Ltd. officially started production for qualified products. After 11 months since its construction in October, 2010, Yongxiang adopts the ‘Yongxiang producing method’ which has attained the national patent. The method uses large energy-saving electric reduction furnace, and the technique of waste heat utilization to realize closed recirculation of materials to avoid the production of silicon tetrachloride. The automation level, energy and material consumption indicators have all reached domestic leading level.
SOLAREX ISTANBUL 2026 | Go West, Let Efficiency Shine Through
2026-04-03
22nd CSPV Invites the World! Another High-Profile Parallel Conference Announced for the 2026 9th China International Photovoltaic and Energy Storage Conference
2026-04-02
Tonghe New Energy (Jintang) Co., Ltd. Battery Products Awarded French Carbon Footprint Certification
2026-04-01
A LIGHTHOUSE IS MORE THAN A CERTIFICATION
2026-03-31
South Africa's Energy Dilemma: Tongwei's TNC 3.0 Modules and TNC High-Efficiency Cells Offer a Targeted Solution
2026-03-30
